Plant for steel processing sector

Client: COMPANY LEADER STEEL PROCESSING SECTOR PRODUCTION Annual production 1.5 million tons laminated product; 800,000 tons of galvanized product; 240,000 tons of pre‐painted product.

Location: Gazzoldo degli Ippoliti - Mantova

Project: Design, manufacture & supply

Water treatment plant: Chemical-physical industrial waste water treatment plant

Raw water source: Industrial waste water coming from steel working processes

Treated water quality: Optimum for application in industrial processing

Capacity: 230 m3/hour

 

Client: Steel processing

Location: Gazzoldo degli Ippoliti - Mantova

Project: Design, manufacture & supply

Water treatment plant: Reverse osmosis (RO)

Raw water source: Onsite wells

Treated water quality: Optimum for application in industrial processing

Capacity: 60 m³/hour

 

Client: Steel processing

Location: Ravenna

Project: Design, manufacture and management of a prototype plant followed by the manufactor installation of the definitive plant.

Water treatment plant: Industrial waste water treatment plant

Raw water source: Industrial waste water coming from steel working processes

Treated water quality: Save to be discharged

Capacity: 40 m³/hour

 

Client: Steel processing

Location: Gazzoldo degli Ippoliti

Project: Design, installation and project management including strat-up and testing of the finisched WWTP.

Water treatment plant: Chemical-physical industrial waste treatment plant (WWTP).

Raw water: Industrial waste water coming from large steel works.

Treated water quality: Suitable for safe discharge into approved superficial water canal.

Capacity: Two line each with the capacity to treat 150 m³/hour of industrial wast water.

Tags: Elimination of mineral salts, Water treatment