whatsapp

Mezzano Rondani: the new treatment plant is now operational, May 08 2013 Work on the treatment plant built by Euro Mec is now complete

 

May 08 2013, Work on the treatment plant built by Euro Mec is now complete


The new treatment plant went into operation at the service of Mezzano Rondani. The new treatment plant will receive the waters of civil type of the fraction with a flow rate of 3.3 cubic meters per hour a tip of 10 cubic meters per hour. The need fulfilled by Euro Mec, to which were entrusted the work, has been to provide a plant of simple construction, economical in maintenance and with a compactness planimetric in respect of the environment and safety.. The plant is a oxidative total cycle, that allows a high yield with the maximum simplicity of operation.


Read the news on www.ilmattinodiparma.it


  


Share on